YOUR BUSINESS AUTHORITY

Springfield, MO

Log in Subscribe

Summer 2019 Construction in the Ozarks: Mystic River Falls

399 Silver Dollar City Parkway, Branson

Posted online

General contractor: Silver Dollar City Maintenance and Construction Department
Size: 152,460 square feet [development footprint]
Estimated cost: $23 million
Estimated completion: Summer 2020
Project description: Herschend Family Entertainment Corp. is bringing a new attraction next summer to Silver Dollar City. Mystic River Falls replaces the demolished Lost River of the Ozarks. The nearly half-mile-long ride features a 45-foot drop, reputedly the tallest raft ride drop in the Western Hemisphere, SDC President Brad Thomas said. The setting will feature natural rock and plant landscaping throughout. Herschend Family Entertainment is the project architect, with Ride Engineers Switzerland (Altendorf, Switzerland) leading the engineering work for the ride. Additional engineering work is provided by Barr Engineering Co. (Minneapolis) and J&M Engineering LLC, structural; and Interpres Building Solutions LLC, mechanical, electrical and plumbing.

Comments

No comments on this story |
Please log in to add your comment
Editors' Pick
Open for Business: The Flying Lap

Plaza Shopping Center gained an arcade with the March 1 opening of The Flying Lap LLC; the repurposing of space operated by Burrell Behavioral Health resulted in the March 18 opening of the company’s second autism center; and a group of downtown business owners teamed up to reopen J.O.B. Public House.

Most Read
Update cookies preferences